🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 6

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 6 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Ogilby
Solar
600 MWWithdrawn / abandoned Imperial, CACAISO May 2008target 2014
Imperial Valley Generation Project
Gas
600 MWWithdrawn / abandoned Imperial, CACAISO Feb 2010target 2014
Bullhead Solar
Solar + storage
600 MWWithdrawn / abandoned Clark, NVCAISO Apr 2019target 2023
Valley Oak Solar
Solar
600 MWWithdrawn / abandoned Kings, CACAISO Jul 2010target 2015
Irish
Gas
600 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2020
Scorpio Storage
Battery storage
600 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
KRCD Community Power Plant
Gas
600 MWWithdrawn / abandoned Fresno, CACAISO Sep 2006target 2012
El Dorado Valley Generation
Gas
600 MWWithdrawn / abandoned Clark, NVCAISO Feb 2010target 2014
Avenal Energy Project
Gas
600 MWWithdrawn / abandoned Kings, CACAISO Aug 2007target 2017
Maricopa Solar
Solar
600 MWWithdrawn / abandoned Kern, CACAISO Jul 2009target 2015
Golden Bear
Solar + storage
594 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Bighorn
Gas
591 MWWithdrawn / abandoned Clark, NVCAISO Nov 2006target 2010
Reliant Energy Bighorn
Gas
591 MWWithdrawn / abandoned Clark, NVCAISO Jun 2005target 2007
Bridgeview Energy Facility
Gas
590 MWWithdrawn / abandoned Contra Costa, CACAISO Dec 2004target 2008
La Luz Energy Center
Solar + storage
588 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Lycka Solar
Solar + storage
587 MWWithdrawn / abandoned Tulare, CACAISO Apr 2020target 2024
Sloan Energy Center
Solar + storage
578 MWWithdrawn / abandoned Clark, NVCAISO Apr 2019target 2023
Castle Wind Offshore
Offshore wind
576 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2018target 2025
Fairfield Energy Center
Gas
575 MWWithdrawn / abandoned Solano, CACAISO Sep 2007target 2011
Palmdale Power Plant
Gas
570 MWWithdrawn / abandoned Los Angeles, CACAISO Feb 2006target 2022
Victorville 2
Gas
570 MWWithdrawn / abandoned San Bernardino, CACAISO Feb 2006target 2012
Spectrum Energy Storage 2
Battery storage
566 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Campito Peak
Battery storage
566 MWWithdrawn / abandoned Inyo, CACAISO Apr 2023target 2031
Reed Meadow
Battery storage
566 MWWithdrawn / abandoned Clark, NVCAISO Apr 2023target 2031
Mojave Solar Park 2
Solar
565 MWWithdrawn / abandoned San Bernardino, CACAISO Sep 2006target 2010
CPV California I
Gas
564 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2007target 2011
Long Beach 5, 6, 7 & 8
Gas
557 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2007target 2013
Fuerte Energy Storage
Battery storage
554 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2024
Monte Cristo Solar 1
Solar
553 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Monte Cristo Solar 2
Solar
553 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Ses Solar Three
Solar
550 MWWithdrawn / abandoned San Bernardino, CACAISO Jun 2006target 2011
South Point Energy Center
Gas
550 MWWithdrawn / abandoned Mohave, AZCAISO Aug 2006target 2009
Golden Hills Power
Gas
550 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2018
Jasper Segs (Fka Sonoran West II)
Solar
540 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2016
Hidden Hills Ranch
Solar
540 MWWithdrawn / abandoned Nye, NVCAISO Mar 2011target 2014
Central Valley II Segs
Solar
540 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Sandy Valley Phase II Segs
Gas
540 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Kairos Hybrid
Solar + storage
539 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Nci Hybrid Power
Solar + storage
538 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2019
Chuckwalla
Solar + storage
535 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Titus Canyon
Solar + storage
533 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
East Altamont Energy Center - Option 2
Gas
531 MWWithdrawn / abandoned Contra Costa, CACAISO Dec 2004target 2008
Milky Way Hybrid Solar
Solar + storage
530 MWWithdrawn / abandoned Kings, CACAISO Apr 2020target 2023
Alum Geothermal
Geothermal
530 MWWithdrawn / abandoned Esmeralda, NVCAISO Apr 2021target 2025
Crossover
Solar + storage
528 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Fontana Energy Center
Gas
527 MWWithdrawn / abandoned San Bernardino, CACAISO Jun 2005target 2008
West Wonder Solar
Solar + storage
525 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Musketeers Solar 1
Solar + storage
525 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Apg Wilson Station
Gas
525 MWWithdrawn / abandoned Merced, CACAISO Apr 2008target 2012
Sorrento
Solar + storage
525 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Page 6 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)