United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Ogilby Solar |
600 MW | Withdrawn / abandoned |
| Imperial Valley Generation Project Gas |
600 MW | Withdrawn / abandoned |
| Bullhead Solar Solar + storage |
600 MW | Withdrawn / abandoned |
| Valley Oak Solar Solar |
600 MW | Withdrawn / abandoned |
| Irish Gas |
600 MW | Withdrawn / abandoned |
| Scorpio Storage Battery storage |
600 MW | Withdrawn / abandoned |
| KRCD Community Power Plant Gas |
600 MW | Withdrawn / abandoned |
| El Dorado Valley Generation Gas |
600 MW | Withdrawn / abandoned |
| Avenal Energy Project Gas |
600 MW | Withdrawn / abandoned |
| Maricopa Solar Solar |
600 MW | Withdrawn / abandoned |
| Golden Bear Solar + storage |
594 MW | Withdrawn / abandoned |
| Bighorn Gas |
591 MW | Withdrawn / abandoned |
| Reliant Energy Bighorn Gas |
591 MW | Withdrawn / abandoned |
| Bridgeview Energy Facility Gas |
590 MW | Withdrawn / abandoned |
| La Luz Energy Center Solar + storage |
588 MW | Withdrawn / abandoned |
| Lycka Solar Solar + storage |
587 MW | Withdrawn / abandoned |
| Sloan Energy Center Solar + storage |
578 MW | Withdrawn / abandoned |
| Castle Wind Offshore Offshore wind |
576 MW | Withdrawn / abandoned |
| Fairfield Energy Center Gas |
575 MW | Withdrawn / abandoned |
| Palmdale Power Plant Gas |
570 MW | Withdrawn / abandoned |
| Victorville 2 Gas |
570 MW | Withdrawn / abandoned |
| Spectrum Energy Storage 2 Battery storage |
566 MW | Withdrawn / abandoned |
| Campito Peak Battery storage |
566 MW | Withdrawn / abandoned |
| Reed Meadow Battery storage |
566 MW | Withdrawn / abandoned |
| Mojave Solar Park 2 Solar |
565 MW | Withdrawn / abandoned |
| CPV California I Gas |
564 MW | Withdrawn / abandoned |
| Long Beach 5, 6, 7 & 8 Gas |
557 MW | Withdrawn / abandoned |
| Fuerte Energy Storage Battery storage |
554 MW | Withdrawn / abandoned |
| Monte Cristo Solar 1 Solar |
553 MW | Withdrawn / abandoned |
| Monte Cristo Solar 2 Solar |
553 MW | Withdrawn / abandoned |
| Ses Solar Three Solar |
550 MW | Withdrawn / abandoned |
| South Point Energy Center Gas |
550 MW | Withdrawn / abandoned |
| Golden Hills Power Gas |
550 MW | Withdrawn / abandoned |
| Jasper Segs (Fka Sonoran West II) Solar |
540 MW | Withdrawn / abandoned |
| Hidden Hills Ranch Solar |
540 MW | Withdrawn / abandoned |
| Central Valley II Segs Solar |
540 MW | Withdrawn / abandoned |
| Sandy Valley Phase II Segs Gas |
540 MW | Withdrawn / abandoned |
| Kairos Hybrid Solar + storage |
539 MW | Withdrawn / abandoned |
| Nci Hybrid Power Solar + storage |
538 MW | Withdrawn / abandoned |
| Chuckwalla Solar + storage |
535 MW | Withdrawn / abandoned |
| Titus Canyon Solar + storage |
533 MW | Withdrawn / abandoned |
| East Altamont Energy Center - Option 2 Gas |
531 MW | Withdrawn / abandoned |
| Milky Way Hybrid Solar Solar + storage |
530 MW | Withdrawn / abandoned |
| Alum Geothermal Geothermal |
530 MW | Withdrawn / abandoned |
| Crossover Solar + storage |
528 MW | Withdrawn / abandoned |
| Fontana Energy Center Gas |
527 MW | Withdrawn / abandoned |
| West Wonder Solar Solar + storage |
525 MW | Withdrawn / abandoned |
| Musketeers Solar 1 Solar + storage |
525 MW | Withdrawn / abandoned |
| Apg Wilson Station Gas |
525 MW | Withdrawn / abandoned |
| Sorrento Solar + storage |
525 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)