United States › Grid › Interconnection queues › California

GAS · CAISO

East Altamont Energy Center - Option 2

East Altamont Energy Center - Option 2 is a 531 MW gas request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2007 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
46
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tesla-Tracy #1 230 kV Line - Tracy Sub
Location
Contra Costa County, California
Technology
Gas: 531 MW
Total requested
531 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 December 2004
Agreement signed
5 September 2007
Proposed online date
July 2008

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Contra Costa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem