Hidden Hills Ranch

Hidden Hills Ranch is a 540 MW solar request withdrawn in the CAISO interconnection queue, in Nye County, Nevada, connecting to VEA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedApr 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
714
Grid region
CAISO (California)
Utility / transmission owner
VEA
Connection point (POI)
Crazy Eye Tap Substation 230kV
Location
Nye County, Nevada
Technology
Solar: 540 MW
Total requested
540 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
December 2014
Withdrawn
April 2013

Location

Marker shows the centre of Nye County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Nye County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem