United States › Grid › Interconnection queues › Nevada

SOLAR + STORAGE · CAISO

Bristlecone

Bristlecone is a 921 MW solar + storage request in interconnection study in the CAISO interconnection queue, in Nye County, Nevada, connecting to GLW.

Queue statusIn planning
  1. PlanningQueued Apr 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2030 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2257
Grid region
CAISO (California)
Utility / transmission owner
GLW
Connection point (POI)
VALLEY SWITCH 230 kV
Location
Nye County, Nevada
Technology
Solar: 461 MW · Battery: 460 MW
Total requested
921 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Active
Entered queue
17 April 2023
Proposed online date
June 2030

Location

Marker shows the centre of Nye County; the queue data does not give exact sites.

Power plants in Nevada · Transmission lines in Nevada

Other requests in Nye County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem