BATTERY STORAGE Β· CAISO

Reed Meadow

Reed Meadow is a 566 MW battery storage request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to GLW.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2245
Grid region
CAISO (California)
Utility / transmission owner
GLW
Connection point (POI)
SLOAN CANYON 230 kV
Location
Clark County, Nevada
Technology
Battery: 566 MW
Total requested
566 MW
Service type
Network resource (NRIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
December 2031
Withdrawn
April 2025

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem