United States › Grid › Interconnection queues › California

SOLAR · CAISO

Ses Solar Three

Ses Solar Three is a 550 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2006 (completed)
  2. Withdrawn / abandonedMar 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
109
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Pisgah Substation
Location
San Bernardino County, California
Technology
Solar: 550 MW
Total requested
550 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 June 2006
Proposed online date
March 2011
Withdrawn
March 2011

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem