United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

GAS Β· CAISO

Reliant Energy Bighorn

Reliant Energy Bighorn is a 591 MW gas request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2005 (completed)
  2. Withdrawn / abandonedJan 2006 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
71
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Eldorado 500/230kV Substation
Location
Clark County, Nevada
Technology
Gas: 591 MW
Total requested
591 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 June 2005
Proposed online date
January 2007
Withdrawn
January 2006

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem