Maricopa Solar

Maricopa Solar is a 600 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2009 (completed)
  2. Withdrawn / abandonedOct 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
487
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Midway-Wheeler Ridge 230kV double circuit line
Location
Kern County, California
Technology
Solar: 600 MW
Total requested
600 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2009
Proposed online date
December 2015
Withdrawn
October 2010

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.