United States › Grid › Interconnection queues › California

SOLAR · CAISO

Mojave Solar Park 2

Mojave Solar Park 2 is a 565 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2006 (completed)
  2. Withdrawn / abandonedApr 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
130
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Mohave Generating Station
Location
San Bernardino County, California
Technology
Solar: 565 MW
Total requested
565 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
13 September 2006
Proposed online date
December 2010
Withdrawn
April 2008

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem