United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR + STORAGE Β· CAISOLa Luz Energy Center
La Luz Energy Center is a 588 MW solar + storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54645
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- DIABLO-GATES #1
- Location
- California
- Technology
- Solar: 587 MW Β· Battery: 1.0 MW
- Total requested
- 588 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- July 2028
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Windwalker OffshoreOffshore wind Β· 1,029 MW Β· agreement signed
- California Valley Solar Ranch (Fka Carrizo Solar Farm II)Solar Β· 250 MW Β· built
- California Valley PVSolar Β· 210 MW Β· built
- Carrizo Plain SolarSolar Β· 190 MW Β· built
- Desert Topaz PV 2Solar Β· 150 MW Β· built
- Caballero StorageBattery storage Β· 106 MW Β· built
- Diablo Canyon P.P. Unit 2Gas Β· 45.0 MW Β· built
- Cuyama SolarSolar Β· 40.0 MW Β· built
- Diablo Canyon P.P. Unit 1Nuclear Β· 37.0 MW Β· built
- IslayWind + storage Β· 2,275 MW Β· withdrawn
- Vinson EnergyWind + storage Β· 1,887 MW Β· withdrawn
- Nimitz 2 GenerationWind + storage Β· 1,887 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem