Jasper Segs (Fka Sonoran West II) is a 540 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedMar 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
842
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Jasper Substation 220kV
Location
San Bernardino County, California
Technology
Solar: 540 MW
Total requested
540 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
October 2016
Withdrawn
March 2012

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.