Nci Hybrid Power

Nci Hybrid Power is a 538 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedMar 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1056
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Talega-Escondido 230kV line
Location
San Diego County, California
Technology
Solar: 30.0 MW · Gas: 448 MW · Battery: 60.0 MW
Total requested
538 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
June 2019
Withdrawn
March 2015

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem