United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

GAS Β· CAISO

El Dorado Valley Generation

El Dorado Valley Generation is a 600 MW gas request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedNov 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
605
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Eldorado Substation 230kV
Location
Clark County, Nevada
Technology
Gas: 600 MW
Total requested
600 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 February 2010
Proposed online date
April 2014
Withdrawn
November 2010

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem