United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas (2024 requests) — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Senator Aggreko Solar Solar + storage · Senator Aggreko Solar LLC |
251 MW | In study |
| Onshore wind project GEN-2024-042, Floyd County Onshore wind |
250 MW | In study |
| Onshore wind project GEN-2024-041, Floyd County Onshore wind |
250 MW | In study |
| Straight Spur Wind Onshore wind · ENGIE IR Holdings LLC |
247 MW | In study |
| Gail Mountain Solar Solar · Gail Mountain Solar, LLC |
244 MW | In study |
| Easy Wind Energy Center Wind + storage · Easy Wind Energy Center, LLC |
241 MW | In study |
| Bob Creek Wind Onshore wind · NextEra Energy Interconnection Holdings, LLC |
240 MW | Agreement signed |
| Solar + storage project J3985, Polk County Solar + storage |
240 MW | In study |
| Camino Ranch Storage 2 SLF Solar + storage · Camino Ranch Solar LLC |
239 MW | In study |
| Camino Ranch Solar 2 SLF Solar + storage · Camino Ranch Solar Project LLC |
237 MW | In study |
| Photon Solar 1 2 SLF Solar · GulfStar Power, LLC |
236 MW | Agreement signed |
| Larrea Solar Solar · Greasewood IV LLC |
232 MW | In study |
| Buffalo Gap 2 Wind Repower Onshore wind · Buffalo Gap Wind Farm 2, LLC |
232 MW | Agreement signed |
| Rio Grand Valley Element Fuels Power Other · Element H2Gen, LLC |
230 MW | In study |
| Cedar Draw BESS Solar + storage · Cedar Draw Solar LLC |
226 MW | In study |
| Tolivar Power Plant (TEF- Due Diligence) Gas · Pecos Power Plant, LLC |
225 MW | Agreement signed |
| Old Fiddler Energy Storage Battery storage · Old Fiddler Energy Storage LLC |
224 MW | In study |
| Angel City Solar Solar · Angel City Energy Center, LLC |
221 MW | In study |
| Coke BESS Battery storage · Coke ESS, LLC |
220 MW | In study |
| Two Barbaras BESS Battery storage · Two Barbaras BESS |
217 MW | Agreement signed |
| Pez Rojo BESS Battery storage · Pez Rojo BESS, LLC |
217 MW | In study |
| Marcos Solar SLF Solar + storage · GRS BESS Texas Eight |
216 MW | In study |
| BumbleBee Solar Solar · BumbleBee Solar Farm LLC |
212 MW | In study |
| Vazlon Solar SLF Solar + storage · Vazlon Energy LLC |
211 MW | In study |
| Freestone Battery Storage Project Battery storage · Freestone Power Generation, LLC |
211 MW | In study |
| Elk Unit 4 Gas · Golden Spread Electric Cooperative, Inc. |
210 MW | In study |
| Moonlit Bayou Storage Battery storage · Moonlit Bayou Energy Center, LLC |
209 MW | In study |
| Clapton Storage Solar + storage · Clapton BESS |
209 MW | In study |
| Sorghum BESS Battery storage · Blue Creek BESS, LLC |
209 MW | Agreement signed |
| Starlit Pasture Storage Battery storage · Starlit Pasture Energy Center, LLC |
209 MW | In study |
| Revolution BESS Battery storage · Nova Clean Energy LLC |
209 MW | In study |
| Zeus Rusk BESS Solar + storage · Rusk BESS, LLC |
209 MW | In study |
| Jolly Rock Storage Center Battery storage · Jolly Rock Storage Center LLC |
209 MW | In study |
| Gusty Windpower Onshore wind · Gusty Windpower, LLC |
209 MW | Agreement signed |
| New Minglewood Energy Center Battery storage · Nova Clean Energy LLC |
208 MW | In study |
| Sunlit Pines BESS SLF Solar + storage · Sunlit Pines BESS LLC |
208 MW | In study |
| Ferdinand Grid BESS II Battery storage · Coval Infrastructure DevCo LLC |
208 MW | In study |
| Burnet Bay Storage Battery storage · TOCE TX BESS 4, LLC |
208 MW | In study |
| Reforzar BESS 1 Battery storage · Tempus Power management LLC |
208 MW | In study |
| Reforzar Bess 2 Battery storage · Tempus Power management LLC |
208 MW | In study |
| Bravo BESS Battery storage · Bravo BESS LLC |
207 MW | In study |
| Old Roman Energy Center Battery storage · Nova Clean Energy LLC |
207 MW | In study |
| River Boat Storage Solar + storage · Champion Creek Storage, LLC |
207 MW | In study |
| Tapaderos Storage Solar + storage · Tapaderos Storage, LLC |
207 MW | In study |
| Sunlit Pines Solar SLF Solar + storage · Sunlit Pines Energy Center LLC |
207 MW | In study |
| Shackleford BESS Battery storage · Shackelford County BESS LLC |
207 MW | In study |
| Plant Road BESS Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
206 MW | In study |
| Anglin BESS Battery storage · Fort Worth BESS LLC |
206 MW | In study |
| Hamby Solar Solar · Abilene GCE LLC |
206 MW | In study |
| Solar + storage project J3586, Montgomery County Solar + storage |
206 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)432 · 104.7 GW
- SPP (Southwest Power Pool)13 · 3,601 MW
- MISO (Midcontinent)3 · 716 MW
- West (non-ISO utilities)4 · 550 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)