United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 35
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gipper Solar Farm Solar · Gipper Solar Farm, LLC |
255 MW | In study |
| Gas project GEN-2023-078, Cass County Gas |
255 MW | In study |
| Onshore wind project J3971, Huron County Onshore wind |
255 MW | In study |
| San Gabriel Solar Solar + storage · San Gabriel Solar LLC |
255 MW | In study |
| Maleza Solar II Solar + storage · Brush Solar, LLC |
255 MW | In study |
| PowerVault BESS Battery storage · SMT Elm Mott BESS |
255 MW | In study |
| Railway BESS Battery storage |
255 MW | Paused / redesign |
| Staked Plains BESS Battery storage |
255 MW | Paused / redesign |
| Onshore wind project J3361, Bay County Onshore wind |
254 MW | In study |
| Battery storage project GEN-2021-029, Linn County Battery storage |
254 MW | In study |
| Grand Mesa BESS Battery storage · PERRY GREEN POWER LLC |
253 MW | In study |
| Collier Ranch Solar Solar |
253 MW | Paused / redesign |
| Armstrong Wind Onshore wind · Big Sky Energy |
253 MW | Paused / redesign |
| Bayside II Solar Solar |
253 MW | Paused / redesign |
| Tall Saddle Solar Solar · Tall Saddle Solar, LLC |
252 MW | In study |
| Bayside 2 BESS Battery storage |
252 MW | Paused / redesign |
| Onshore wind project J3078, Peoria County Onshore wind |
252 MW | In study |
| Lazy U Solar 2 Solar · Lazy U Solar 2 |
252 MW | In study |
| Pandora Solar Solar |
252 MW | Paused / redesign |
| Little Ridge Storage Battery storage · TX BESS B LLC |
252 MW | In study |
| Lazy U Solar 1 Solar · Lazy U Solar 1 |
252 MW | In study |
| Straight Spur Solar Solar + storage · ENGIE IR Holdings LLC |
252 MW | In study |
| Velociraptor Solar II Solar + storage · Greyhound Solar 3 LLC |
252 MW | In study |
| Velociraptor Solar I Solar + storage · Greyhound Solar 2 |
252 MW | In study |
| Ogalalla Storage Battery storage · Hecate Energy Ogalalla Solar LLC |
252 MW | In study |
| Paint Brush PV2 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Juniper Ridge BESS 2 Battery storage · Lazy U ESS 2 |
252 MW | In study |
| Paint Brush PV3 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Onshore wind project J2260, Presque Isle County Onshore wind |
252 MW | In study |
| Cowboy Power Gas Plant Gas · Vaquero Power, LLC |
252 MW | In study |
| Paint Brush PV4 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Paint Brush PV1 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Juniper Ridge BESS 1 Battery storage · Lazy U ESS 1 |
252 MW | In study |
| Buffalo Meadow Solar Solar + storage · Buffalo Meadow Energy Center, LLC |
251 MW | In study |
| Mesa View Storage Battery storage · Mesa View Storage, LLC |
251 MW | In study |
| Oak Valley Solar Solar · Oak Valley Solar LLC |
251 MW | In study |
| Brela BESS LLC Battery storage · Brela BESS LLC |
251 MW | In study |
| Black Hawk Solar Solar · ACE DevCo NC, LLC |
251 MW | In study |
| Wake Wind Energy Onshore wind · WAKE WIND ENERGY |
251 MW | In study |
| Fort Concho Energy storage Battery storage · Rocky Mountain Energy Development, LLC |
251 MW | In study |
| Cantaloupe Storage Battery storage |
251 MW | Paused / redesign |
| Tiger Storage Battery storage |
251 MW | Paused / redesign |
| Replacing 244 MW of Solar with Nuclear; Duane Arnold Nuclear |
251 MW | In study |
| Skeeter Solar Solar · Mesquite Solar, LLC |
251 MW | In study |
| Parula Energy Center Battery storage · Parula Energy Center |
251 MW | In study |
| Senator Aggreko Solar Solar + storage · Senator Aggreko Solar LLC |
251 MW | In study |
| Bluegill BESS Battery storage · Bluegill BESS, LLC |
251 MW | In study |
| Onshore wind project GI-1503, Williams County Onshore wind |
251 MW | In study |
| Alkali Creek Wind 2 Onshore wind · Alkali Creek Wind, LLC |
250 MW | In study |
| Kontiki 2 Wind (ERNEST) Onshore wind |
250 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)