United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 29
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Stegall Storage Solar + storage · BT Martin Solar, LLC |
50.5 MW | In study |
| Albatross BESS Battery storage · Albatross Solar, LLC |
50.4 MW | In study |
| Pearl Crescent Storage Solar + storage · RWE Solar Development, LLC |
50.3 MW | In study |
| Surfside Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
50.3 MW | In study |
| Findley Solar Solar + storage · Gransolar Texas Sixteen, LLC |
50.3 MW | In study |
| Marick Rose BESS Battery storage · Marick BESS |
50.2 MW | In study |
| Fort Chadbourne Cattle BESS Battery storage · Fort Chadbourne BESS |
50.2 MW | In study |
| Makalu Solar Solar · Abei Energy Green X LLC |
50.2 MW | In study |
| Beeman BESS Battery storage · Beeman BESS LLC |
50.2 MW | In study |
| Voyager Storage Battery storage · EDF Renewables Development, Inc. |
50.1 MW | In study |
| Tokyo TxHSR TPSS EW-1 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Edgewater Storage Battery storage · Edgewater Battery Storage LLC |
50.0 MW | In study |
| Atlanta TxHSR TPSS DS-1 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Battery storage project GEN-2024-305, Marion County Battery storage |
50.0 MW | In study |
| Barcelona TxHSR TPSS HN-4 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Turin TxHSR TPSS HN-6 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Chariot Storage Battery storage · Chariot Storage LLC |
50.0 MW | In study |
| Dart Energy Storage A1 Battery storage · Dart Energy Storage LLC |
50.0 MW | In study |
| Apogee Wind II Onshore wind · King Creek Wind Farm 3, LLC |
47.3 MW | In study |
| Sword BESS Solar + storage · Hidalgo Solar LLC |
44.4 MW | In study |
| Electric E - West Texas Generation Gas · Electric E Power Marketing |
43.6 MW | In study |
| Graphic Packaging Gas Gas · Graphic Packaging International |
43.4 MW | In study |
| Old Sorrell Energy Storage Battery storage |
43.1 MW | Paused / redesign |
| Hector Storage Solar + storage · Hector Solar, LLC |
42.7 MW | In study |
| Braswell Solar Solar · Gransolar Texas Nine, LLC |
42.6 MW | In study |
| Pamplona Solar Solar + storage · Karol Solar III |
42.4 MW | In study |
| La Mancha Storage SLF Solar + storage · La Mancha Storage, LLC |
40.9 MW | In study |
| La Mancha Solar SLF Solar + storage · La Mancha Solar, LLC |
40.9 MW | In study |
| Buck Ranch Solar SLF Solar + storage · Buck Ranch Solar, LLC |
40.8 MW | In study |
| Buck Ranch Storage SLF Solar + storage · Buck Ranch Solar, LLC |
40.8 MW | In study |
| Paolo Sole Hamilton Solar Solar · Viridian Power Development, LLC |
40.6 MW | In study |
| Paolo Sole Gustine Solar Solar · Viridian Power Development, LLC |
40.3 MW | In study |
| Ashra Solar SLF Solar + storage · Ashra Solar, LLC |
40.3 MW | In study |
| SP TX-12B Phase III Solar · ConEd Development |
40.0 MW | In study |
| Lueders Solar Solar · Innovative Solar 75 |
40.0 MW | In study |
| Tain Solar Solar · Abei Energy Green VII LLC |
37.5 MW | In study |
| Blanket Ranch South Storage Solar + storage · Blanket Ranch South Solar, LLC |
34.3 MW | In study |
| Ty Cooke Gas |
33.0 MW | Paused / redesign |
| Hecate Solar Solar · Hecate Energy |
33.0 MW | Paused / redesign |
| Weathervane Storage SLF Battery storage |
32.5 MW | Paused / redesign |
| Meridian BESS Battery storage · Navitas Energy- Meredian BESS |
31.2 MW | In study |
| Lager Storage Battery storage · Momentum Lager LLC |
31.1 MW | In study |
| Hooper Storage Solar + storage · BT Brown Solar, LLC |
30.7 MW | In study |
| M-Bar Solar I Solar + storage · M-Bar Energy I, LLC |
30.2 MW | In study |
| Half Moon Battery Battery storage |
30.2 MW | Paused / redesign |
| Spinel Solar Solar |
30.0 MW | Paused / redesign |
| Hillboro Wind Wind + storage · Abei Energy Green XI LLC |
27.8 MW | In study |
| Zeus Rusk Solar Solar + storage · Rusk Solar, LLC |
26.8 MW | In study |
| Fowler Ranch Storage Battery storage · Crane BESS, LLC |
26.1 MW | In study |
| NET Power Demonstration plant Gas · NET Power LLC |
25.5 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)