🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Texas — page 29

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,486351.5 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,486 requests · page 29 of 30
ProjectCapacityStatusLocationRegionQueuedOnline
Stegall Storage
Solar + storage · BT Martin Solar, LLC
50.5 MWIn study Robertson, TXERCOT Aug 2023target 2027
Albatross BESS
Battery storage · Albatross Solar, LLC
50.4 MWIn study Mclennan, TXERCOT May 2022target 2028
Pearl Crescent Storage
Solar + storage · RWE Solar Development, LLC
50.3 MWIn study Colorado, TXERCOT Dec 2019target 2026
Surfside Energy Storage
Battery storage · Rocky Mountain Energy Holdings, LLC
50.3 MWIn study Brazoria, TXERCOT Jul 2023target 2028
Findley Solar
Solar + storage · Gransolar Texas Sixteen, LLC
50.3 MWIn study Limestone, TXERCOT Oct 2021target 2028
Marick Rose BESS
Battery storage · Marick BESS
50.2 MWIn study Fort Bend, TXERCOT Jul 2023target 2026
Fort Chadbourne Cattle BESS
Battery storage · Fort Chadbourne BESS
50.2 MWIn study Coke, TXERCOT Aug 2023target 2027
Makalu Solar
Solar · Abei Energy Green X LLC
50.2 MWIn study Hunt, TXERCOT Jan 2021target 2028
Beeman BESS
Battery storage · Beeman BESS LLC
50.2 MWIn study Gonzales, TXERCOT Apr 2023target 2027
Voyager Storage
Battery storage · EDF Renewables Development, Inc.
50.1 MWIn study Wharton, TXERCOT Jan 2019target 2028
Tokyo TxHSR TPSS EW-1
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Ellis, TXERCOT Jan 2019target 2028
Edgewater Storage
Battery storage · Edgewater Battery Storage LLC
50.0 MWIn study Ellis, TXERCOT Apr 2019target 2028
Atlanta TxHSR TPSS DS-1
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Dallas, TXERCOT Jan 2019target 2028
Battery storage project GEN-2024-305, Marion County
Battery storage
50.0 MWIn study Marion, TXSPP Mar 2025target 2029
Barcelona TxHSR TPSS HN-4
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Harris, TXERCOT Jan 2019target 2028
Turin TxHSR TPSS HN-6
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Grimes, TXERCOT Sep 2019target 2028
Chariot Storage
Battery storage · Chariot Storage LLC
50.0 MWIn study Limestone, TXERCOT Mar 2019target 2028
Dart Energy Storage A1
Battery storage · Dart Energy Storage LLC
50.0 MWIn study Taylor, TXERCOT Feb 2025target 2028
Apogee Wind II
Onshore wind · King Creek Wind Farm 3, LLC
47.3 MWIn study Throckmorton, TXERCOT Jul 2021target 2027
Sword BESS
Solar + storage · Hidalgo Solar LLC
44.4 MWIn study Starr, TXERCOT Mar 2024target 2029
Electric E - West Texas Generation
Gas · Electric E Power Marketing
43.6 MWIn study Loving, TXERCOT Oct 2024target 2028
Graphic Packaging Gas
Gas · Graphic Packaging International
43.4 MWIn study Mclennan, TXERCOT Jan 2024target 2026
Old Sorrell Energy Storage
Battery storage
43.1 MWPaused / redesign Concho, TXERCOT Jun 2023
Hector Storage
Solar + storage · Hector Solar, LLC
42.7 MWIn study Navarro, TXERCOT Oct 2022target 2027
Braswell Solar
Solar · Gransolar Texas Nine, LLC
42.6 MWIn study Mclennan, TXERCOT Aug 2021target 2028
Pamplona Solar
Solar + storage · Karol Solar III
42.4 MWIn study Austin, TXERCOT Aug 2023target 2028
La Mancha Storage SLF
Solar + storage · La Mancha Storage, LLC
40.9 MWIn study Zavala, TXERCOT Nov 2024target 2028
La Mancha Solar SLF
Solar + storage · La Mancha Solar, LLC
40.9 MWIn study Zavala, TXERCOT Nov 2024target 2028
Buck Ranch Solar SLF
Solar + storage · Buck Ranch Solar, LLC
40.8 MWIn study Live Oak, TXERCOT Dec 2024target 2028
Buck Ranch Storage SLF
Solar + storage · Buck Ranch Solar, LLC
40.8 MWIn study Live Oak, TXERCOT Jan 2025target 2028
Paolo Sole Hamilton Solar
Solar · Viridian Power Development, LLC
40.6 MWIn study Hamilton, TXERCOT May 2025target 2028
Paolo Sole Gustine Solar
Solar · Viridian Power Development, LLC
40.3 MWIn study Comanche, TXERCOT May 2025target 2028
Ashra Solar SLF
Solar + storage · Ashra Solar, LLC
40.3 MWIn study Uvalde, TXERCOT Apr 2025target 2028
SP TX-12B Phase III
Solar · ConEd Development
40.0 MWIn study Upton, TXERCOT Sep 2018target 2025
Lueders Solar
Solar · Innovative Solar 75
40.0 MWIn study Haskell, TXERCOT Jul 2017target 2028
Tain Solar
Solar · Abei Energy Green VII LLC
37.5 MWIn study Caldwell, TXERCOT Dec 2020target 2027
Blanket Ranch South Storage
Solar + storage · Blanket Ranch South Solar, LLC
34.3 MWIn study Brown, TXERCOT Jun 2022target 2028
Ty Cooke
Gas
33.0 MWPaused / redesign Lubbock, TXERCOT Aug 2020target 2021
Hecate Solar
Solar · Hecate Energy
33.0 MWPaused / redesign Brewster, TXERCOT Mar 2015target 2020
Weathervane Storage SLF
Battery storage
32.5 MWPaused / redesign Montague, TXERCOT Aug 2023
Meridian BESS
Battery storage · Navitas Energy- Meredian BESS
31.2 MWIn study Bosque, TXERCOT Mar 2023target 2027
Lager Storage
Battery storage · Momentum Lager LLC
31.1 MWIn study Nueces, TXERCOT Feb 2022target 2028
Hooper Storage
Solar + storage · BT Brown Solar, LLC
30.7 MWIn study Lee, TXERCOT Dec 2022target 2027
M-Bar Solar I
Solar + storage · M-Bar Energy I, LLC
30.2 MWIn study Ector, TXERCOT Dec 2024target 2028
Half Moon Battery
Battery storage
30.2 MWPaused / redesign Hidalgo, TXERCOT Sep 2018
Spinel Solar
Solar
30.0 MWPaused / redesign Medina, TXERCOT Aug 2017
Hillboro Wind
Wind + storage · Abei Energy Green XI LLC
27.8 MWIn study Hill, TXERCOT Jul 2024target 2028
Zeus Rusk Solar
Solar + storage · Rusk Solar, LLC
26.8 MWIn study Rusk, TXERCOT Mar 2024target 2027
Fowler Ranch Storage
Battery storage · Crane BESS, LLC
26.1 MWIn study Crane, TXERCOT Jun 2021target 2027
NET Power Demonstration plant
Gas · NET Power LLC
25.5 MWIn study Harris, TXERCOT Dec 2023target 2027
Page 29 of 30

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)