Withdrawn queue requests in CAISO (California) — page 27

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 27 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Hood 1
Solar
110 MWWithdrawn / abandoned Tulare, CACAISO Apr 2018target 2022
Harvest Energy Storage Project (Fka Otay Mesa MSS)
Battery storage
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Las Hermanas BESS
Battery storage
110 MWWithdrawn / abandoned Shasta, CACAISO May 2016target 2019
FRV Diamond Valley Solar
Solar
110 MWWithdrawn / abandoned Riverside, CACAISO Feb 2010target 2013
Pio Pico 2
Gas
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
DRY Creek Solar
Solar
110 MWWithdrawn / abandoned Kern, CACAISO Apr 2018target 2022
Pio Pico Unit 4
Gas
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
Sidewinder Solar
Solar
109 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2019
Boa Vista Storage
Battery storage
109 MWWithdrawn / abandoned San Benito, CACAISO Apr 2021target 2025
Algonquin Power Sanger 2
Gas
108 MWWithdrawn / abandoned CACAISO Apr 2013target 2020
Soleado
Solar + storage
108 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Blue Mountain Wind
Onshore wind
108 MWWithdrawn / abandoned Los Angeles, CACAISO May 2017target 2020
San Joaquin 1 & 2
Solar
107 MWWithdrawn / abandoned Fresno, CACAISO Feb 2010target 2012
Bethel 7 & 8 Solar Thermal Hybrid Project
Other
107 MWWithdrawn / abandoned Fresno, CACAISO Dec 2007target 2012
Wagon Wheel Energy Storage
Battery storage
106 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
La Fuente Energy Storage
Battery storage
106 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2024
Charros Energy Center
Solar + storage
106 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Hemmings Storage
Battery storage
106 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2021target 2025
Zietz Storage
Battery storage
106 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2021target 2025
Shuteye Peak Energy Storage
Battery storage
106 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Inca
Solar
106 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2020
Crown
Solar
106 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2020
Capetown 2 Hybrid
Wind + storage
106 MWWithdrawn / abandoned Humboldt, CACAISO Apr 2019target 2021
Tower 1 Energy Storage
Battery storage
105 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2029
Birdrock
Battery storage
105 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2023target 2029
Point Sal Wind
Onshore wind
105 MWWithdrawn / abandoned Santa Barbara, CACAISO Nov 2006target 2009
Soledad Wind Energy Park
Onshore wind
105 MWWithdrawn / abandoned Monterey, CACAISO Jul 2007target 2010
Cuerno Grande Wind 2
Wind + storage
105 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Manzanita Inyaha Solar
Solar + storage
105 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
ONNI Solar
Solar + storage
105 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Puerta Renewable Energy Reliability Center
Solar + storage
105 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2019
Tesoro Refinery Cogeneration
Gas
104 MWWithdrawn / abandoned Los Angeles, CACAISO Sep 2007target 2010
Peach Storage
Battery storage
104 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2023target 2031
Hinton Energy Storage
Battery storage
103 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2024
Dernopi Solar
Solar
103 MWWithdrawn / abandoned Fresno, CACAISO Apr 2018target 2021
Maizen Blue Solar 1
Solar + storage
103 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2019
La Posta
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Millerton
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Freeride Solar Plus
Solar + storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Garda
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Lugano
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Bridgehead Es
Battery storage
103 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2015target 2021
Sage Solar
Solar
103 MWWithdrawn / abandoned Alameda, CACAISO May 2017target 2020
Delirium Dive
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Waverly (Formly Green Growth Hybrid)
Solar + storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Como
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Glacier Point
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Eyre
Battery storage
103 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Wady Solar
Solar
103 MWWithdrawn / abandoned Madera, CACAISO May 2016target 2020
North Bay Energy Storage
Battery storage
103 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2020target 2027
Page 27 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)