United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 27
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hood 1 Solar |
110 MW | Withdrawn / abandoned |
| Harvest Energy Storage Project (Fka Otay Mesa MSS) Battery storage |
110 MW | Withdrawn / abandoned |
| Las Hermanas BESS Battery storage |
110 MW | Withdrawn / abandoned |
| FRV Diamond Valley Solar Solar |
110 MW | Withdrawn / abandoned |
| Pio Pico 2 Gas |
110 MW | Withdrawn / abandoned |
| DRY Creek Solar Solar |
110 MW | Withdrawn / abandoned |
| Pio Pico Unit 4 Gas |
110 MW | Withdrawn / abandoned |
| Sidewinder Solar Solar |
109 MW | Withdrawn / abandoned |
| Boa Vista Storage Battery storage |
109 MW | Withdrawn / abandoned |
| Algonquin Power Sanger 2 Gas |
108 MW | Withdrawn / abandoned |
| Soleado Solar + storage |
108 MW | Withdrawn / abandoned |
| Blue Mountain Wind Onshore wind |
108 MW | Withdrawn / abandoned |
| San Joaquin 1 & 2 Solar |
107 MW | Withdrawn / abandoned |
| Bethel 7 & 8 Solar Thermal Hybrid Project Other |
107 MW | Withdrawn / abandoned |
| Wagon Wheel Energy Storage Battery storage |
106 MW | Withdrawn / abandoned |
| La Fuente Energy Storage Battery storage |
106 MW | Withdrawn / abandoned |
| Charros Energy Center Solar + storage |
106 MW | Withdrawn / abandoned |
| Hemmings Storage Battery storage |
106 MW | Withdrawn / abandoned |
| Zietz Storage Battery storage |
106 MW | Withdrawn / abandoned |
| Shuteye Peak Energy Storage Battery storage |
106 MW | Withdrawn / abandoned |
| Inca Solar |
106 MW | Withdrawn / abandoned |
| Crown Solar |
106 MW | Withdrawn / abandoned |
| Capetown 2 Hybrid Wind + storage |
106 MW | Withdrawn / abandoned |
| Tower 1 Energy Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Birdrock Battery storage |
105 MW | Withdrawn / abandoned |
| Point Sal Wind Onshore wind |
105 MW | Withdrawn / abandoned |
| Soledad Wind Energy Park Onshore wind |
105 MW | Withdrawn / abandoned |
| Cuerno Grande Wind 2 Wind + storage |
105 MW | Withdrawn / abandoned |
| Manzanita Inyaha Solar Solar + storage |
105 MW | Withdrawn / abandoned |
| ONNI Solar Solar + storage |
105 MW | Withdrawn / abandoned |
| Puerta Renewable Energy Reliability Center Solar + storage |
105 MW | Withdrawn / abandoned |
| Tesoro Refinery Cogeneration Gas |
104 MW | Withdrawn / abandoned |
| Peach Storage Battery storage |
104 MW | Withdrawn / abandoned |
| Hinton Energy Storage Battery storage |
103 MW | Withdrawn / abandoned |
| Dernopi Solar Solar |
103 MW | Withdrawn / abandoned |
| Maizen Blue Solar 1 Solar + storage |
103 MW | Withdrawn / abandoned |
| La Posta Battery storage |
103 MW | Withdrawn / abandoned |
| Millerton Battery storage |
103 MW | Withdrawn / abandoned |
| Freeride Solar Plus Solar + storage |
103 MW | Withdrawn / abandoned |
| Garda Battery storage |
103 MW | Withdrawn / abandoned |
| Lugano Battery storage |
103 MW | Withdrawn / abandoned |
| Bridgehead Es Battery storage |
103 MW | Withdrawn / abandoned |
| Sage Solar Solar |
103 MW | Withdrawn / abandoned |
| Delirium Dive Battery storage |
103 MW | Withdrawn / abandoned |
| Waverly (Formly Green Growth Hybrid) Solar + storage |
103 MW | Withdrawn / abandoned |
| Como Battery storage |
103 MW | Withdrawn / abandoned |
| Glacier Point Battery storage |
103 MW | Withdrawn / abandoned |
| Eyre Battery storage |
103 MW | Withdrawn / abandoned |
| Wady Solar Solar |
103 MW | Withdrawn / abandoned |
| North Bay Energy Storage Battery storage |
103 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)