United States › Grid › Interconnection queues › California
ONSHORE WIND · CAISOPoint Sal Wind
Point Sal Wind is a 105 MW onshore wind request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2006 (completed)
- Withdrawn / abandonedOct 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 152
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Mesa-Divide #1 115kV line
- Location
- Santa Barbara County, California
- Technology
- Wind: 105 MW
- Total requested
- 105 MW
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 22 November 2006
- Proposed online date
- December 2009
- Withdrawn
- October 2008
Location
Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Santa Barbara County
- Central Coast Wind 1Onshore wind · 772 MW · withdrawn
- AnacapaSolar + storage · 309 MW · withdrawn
- Pacific Renewable Energy Generation LLC (Fka Lompoc Wind Power Project)Onshore wind · 55.5 MW · withdrawn
- Cuyama Solar ISolar · 50.0 MW · withdrawn
- Santa Maria Energy BESS (Fka Santa Maria Energy Reliability Center)Battery storage · 42.0 MW · withdrawn
- Central CoastOnshore wind · 40.0 MW · withdrawn
- Gaucho StorageBattery storage · 32.4 MW · withdrawn
- LYNX SolarSolar · 30.9 MW · withdrawn
- Hanson Energy CenterBattery storage · 30.8 MW · withdrawn
- Bfo PV-18Solar · 20.0 MW · withdrawn
- Zannon SolarSolar · 5.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem