Bfo PV-18

Bfo PV-18 is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2010 (completed)
  2. Withdrawn / abandonedJan 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
653C
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Taft-Cuyama#1 70kV
Location
Santa Barbara County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 September 2010
Proposed online date
July 2012
Withdrawn
January 2011

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Santa Barbara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem