Central Coast

Central Coast is a 40.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2007 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
253
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cabrillo Substation 115kV
Location
Santa Barbara County, California
Technology
Wind: 40.0 MW
Total requested
40.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
13 August 2007
Proposed online date
December 2011
Withdrawn
November 2008

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Barbara County