Cuyama Solar I

Cuyama Solar I is a 50.0 MW solar request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
367
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
69kV proximate to the Cuyama Substation
Location
Santa Barbara County, California
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
12 May 2008
Proposed online date
December 2009
Withdrawn
November 2008

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.