United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Santa Maria Energy BESS (Fka Santa Maria Energy Reliability Center)

Santa Maria Energy BESS (Fka Santa Maria Energy Reliability Center) is a 42.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedMar 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1156
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Santa Maria Cogen 115 kV Tap
Location
Santa Barbara County, California
Technology
Battery: 42.0 MW
Total requested
42.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
May 2018
Withdrawn
March 2016

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Barbara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem