SOLAR Β· CAISO

Zannon Solar

Zannon Solar is a 5.0 MW solar request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2011 (completed)
  2. Withdrawn / abandonedSep 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
876
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cuyama Substation
Location
Santa Barbara County, California
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
21 November 2011
Proposed online date
October 2013
Withdrawn
September 2012

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Santa Barbara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem