ONSHORE WIND · CAISO

Pacific Renewable Energy Generation LLC (Fka Lompoc Wind Power Project)

Pacific Renewable Energy Generation LLC (Fka Lompoc Wind Power Project) is a 55.5 MW onshore wind request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Divide-Cabrillo #2 115kV line tap
Location
Santa Barbara County, California
Technology
Wind: 55.5 MW
Total requested
55.5 MW
Study phase
Executed
Queue status
Withdrawn
Entered queue
11 March 2003
Proposed online date
December 2015

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.