United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Hanson Energy Center

Hanson Energy Center is a 30.8 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1735
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Santa Maria Cogen Tap 115kV Line
Location
Santa Barbara County, California
Technology
Battery: 30.8 MW
Total requested
30.8 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
July 2023
Withdrawn
July 2020

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Barbara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem