LYNX Solar

LYNX Solar is a 30.9 MW solar request withdrawn in the CAISO interconnection queue, in Santa Barbara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedJul 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1396
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cuyama 2 Substation 70kV
Location
Santa Barbara County, California
Technology
Solar: 30.9 MW
Total requested
30.9 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
August 2021
Withdrawn
July 2017

Location

Marker shows the centre of Santa Barbara County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Santa Barbara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem