Bethel 7 & 8 Solar Thermal Hybrid Project

Bethel 7 & 8 Solar Thermal Hybrid Project is a 107 MW other request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2007 (completed)
  2. Withdrawn / abandonedApr 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
283
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Gates Substation 230kV bus
Location
Fresno County, California
Technology
Other: 107 MW
Total requested
107 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
12 December 2007
Proposed online date
September 2012
Withdrawn
April 2011

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.