Bridgehead Es

Bridgehead Es is a 103 MW battery storage request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedMar 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1099
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Du Pont Substation 60 kV Bus
Location
Contra Costa County, California
Technology
Battery: 103 MW
Total requested
103 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
December 2021
Withdrawn
March 2016

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.