SOLAR + STORAGE Β· CAISOCharros Energy Center
Charros Energy Center is a 106 MW solar + storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54760
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Rio Oso-Colgate & Rio Oso-Round Mountain T-Line
- Location
- California
- Technology
- Solar: 105 MW Β· Battery: 1.0 MW
- Total requested
- 106 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- July 2028
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Prospect Energy CenterGas Β· 310 MW Β· withdrawn
- Tres Rios Energy CenterSolar + storage Β· 256 MW Β· withdrawn
- Walton Energy Reliability CenterBattery storage Β· 52.8 MW Β· withdrawn
- Indeck Yuba Energy CenterSolar Β· 15.0 MW Β· withdrawn
- Camptonville BIOPOWER1Other Β· 5.5 MW Β· withdrawn
- Camptonville BiopowerOther Β· 3.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem