United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Walton Energy Reliability Center

Walton Energy Reliability Center is a 52.8 MW battery storage request withdrawn in the CAISO interconnection queue, in Yuba County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedJun 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1365
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Yuba City Cogen tap line-Pease 60kV
Location
Yuba County, California
Technology
Battery: 52.8 MW
Total requested
52.8 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
December 2019
Withdrawn
June 2017

Location

Marker shows the centre of Yuba County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Yuba County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem