United States βΊ Grid βΊ Interconnection queues βΊ California
OTHER Β· CAISOCamptonville BIOPOWER1
Camptonville BIOPOWER1 is a 5.5 MW other request withdrawn in the CAISO interconnection queue, in Yuba County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1537
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- COLGATE-CHALLENGE 60kV
- Location
- Yuba County, California
- Technology
- Other: 5.5 MW
- Total requested
- 5.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 5 April 2019
- Proposed online date
- March 2022
- Withdrawn
- March 2020
Location
Marker shows the centre of Yuba County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Yuba County
- Prospect Energy CenterGas Β· 310 MW Β· withdrawn
- Tres Rios Energy CenterSolar + storage Β· 256 MW Β· withdrawn
- Charros Energy CenterSolar + storage Β· 106 MW Β· withdrawn
- Walton Energy Reliability CenterBattery storage Β· 52.8 MW Β· withdrawn
- Indeck Yuba Energy CenterSolar Β· 15.0 MW Β· withdrawn
- Camptonville BiopowerOther Β· 3.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem