United States › Grid › Interconnection queues › California
SOLAR + STORAGE · CAISOTres Rios Energy Center
Tres Rios Energy Center is a 256 MW solar + storage request withdrawn in the CAISO interconnection queue, in Yuba County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1855
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Table Mtn-Rio Oso 230 kV
- Location
- Yuba County, California
- Technology
- Solar: 165 MW · Battery: 90.3 MW
- Total requested
- 256 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2021
- Proposed online date
- March 2025
- Withdrawn
- December 2022
Location
Marker shows the centre of Yuba County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Yuba County
- Prospect Energy CenterGas · 310 MW · withdrawn
- Charros Energy CenterSolar + storage · 106 MW · withdrawn
- Walton Energy Reliability CenterBattery storage · 52.8 MW · withdrawn
- Indeck Yuba Energy CenterSolar · 15.0 MW · withdrawn
- Camptonville BIOPOWER1Other · 5.5 MW · withdrawn
- Camptonville BiopowerOther · 3.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem