Pio Pico 2

Pio Pico 2 is a 110 MW gas request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedMay 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
969
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Otay Mesa Switchyard 230kV
Location
San Diego County, California
Technology
Gas: 110 MW
Total requested
110 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
April 2017
Withdrawn
May 2014

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.