United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Sidewinder Solar

Sidewinder Solar is a 109 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedJul 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1199
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Red Bluff 220kV bus
Location
Riverside County, California
Technology
Solar: 109 MW
Total requested
109 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
December 2019
Withdrawn
July 2015

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem