United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Soledad Wind Energy Park

Soledad Wind Energy Park is a 105 MW onshore wind request withdrawn in the CAISO interconnection queue, in Monterey County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2007 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
249
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Moss-Linding-Salinas-Soledad 115kV #1 and #2 lines #1 line & Tap N/O Moss Landing-Salinas-Soledad #2
Location
Monterey County, California
Technology
Wind: 105 MW
Total requested
105 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 July 2007
Proposed online date
November 2010
Withdrawn
November 2008

Location

Marker shows the centre of Monterey County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Monterey County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem