United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Zietz Storage

Zietz Storage is a 106 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Clara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1884
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Llagas Substation 115 kV
Location
Santa Clara County, California
Technology
Battery: 106 MW
Total requested
106 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
October 2025
Withdrawn
December 2022

Location

Marker shows the centre of Santa Clara County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Clara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem