🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in ERCOT (Texas) — page 26

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,408328.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,408 requests · page 26 of 29
ProjectCapacityStatusLocationRegionQueuedOnline
Photo BESS 1
Solar + storage · CED Development Inc.
75.0 MWIn study Uvalde, TXERCOT Oct 2021target 2027
French Riviera Storage
Battery storage · Arana Creek Battery Storage LLC
75.0 MWIn study Kleberg, TXERCOT Feb 2023target 2028
Valdivian Solar
Solar · Abei Energy Green III LLC
74.9 MWIn study Hunt, TXERCOT Feb 2023target 2028
Sunbeam Solar
Solar · Buckeye Midway Solar
74.4 MWIn study San Patricio, TXERCOT Oct 2024target 2028
Owego Solar
Solar · Hecate Energy
74.0 MWPaused / redesign Pecos, TXERCOT Apr 2015target 2020
Umbra (Stockyard) BESS
Battery storage
73.0 MWPaused / redesign Franklin, TXERCOT Jan 2021
Sullivan BESS
Solar + storage · Sullivan Solar LLC
72.2 MWIn study Hidalgo, TXERCOT Mar 2024target 2029
Texas Sun Solar
Solar · Pigg Grounds LLC
71.7 MWIn study Jackson, TXERCOT Sep 2025target 2027
7L Solar SLF
Solar + storage · 7L Solar, LLC
71.6 MWIn study Dimmit, TXERCOT Sep 2025target 2029
Pato Blanco Storage
Battery storage · TX BESS 4, LLC
71.3 MWIn study Fort Bend, TXERCOT May 2023target 2026
Edens Solar
Solar · Hill PV, LLC
70.4 MWIn study Hill, TXERCOT Oct 2023target 2027
Venture Hill Storage
Battery storage · KCE TX 24, LLC
70.4 MWIn study Travis, TXERCOT Feb 2021target 2026
Kildare
Solar · Galsol, LLC
70.0 MWIn study Jackson, TXERCOT Jan 2022target 2026
Creekfield Storage
Battery storage
69.0 MWPaused / redesign Fort Bend, TXERCOT Nov 2020
Symank Solar
Solar · BT Symank Solar, LLC
66.6 MWIn study Bosque, TXERCOT Nov 2024target 2027
Lamar Unit 1 Repower
Gas · La Frontera Holdings, LLC
66.0 MWIn study Lamar, TXERCOT Jun 2022target 2027
Smith Lake Storage DC
Solar + storage · Smith Lake Solar
65.0 MWIn study Grimes, TXERCOT Mar 2022target 2028
Demeter Storage
Solar + storage · Demeter Solar, LLC
65.0 MWIn study Caldwell, TXERCOT Aug 2022target 2029
PRI Solar
Solar · BHER Power Resources, Inc.
63.8 MWIn study Howard, TXERCOT Jul 2025target 2027
Iron Cowboy Storage
Solar + storage · Vaquero II Storage, LLC
63.3 MWIn study San Patricio, TXERCOT Jun 2025target 2028
Angus Storage
Battery storage
63.0 MWPaused / redesign Bosque, TXERCOT Nov 2017
Little Star Solar
Solar · RWE Clean Energy Development, LLC
61.6 MWIn study Bastrop, TXERCOT Jul 2024target 2026
Beaverhead Solar SLF
Solar + storage · Beaverhead Solar, LLC
61.5 MWIn study Jim Wells, TXERCOT Aug 2024target 2027
Beaverhead Storage SLF
Solar + storage · Beaverhead Solar, LLC
61.5 MWIn study Jim Wells, TXERCOT Aug 2024target 2027
Centennial Solar
Solar · Centennial AD 8 LLC
61.4 MWIn study Menard, TXERCOT Jan 2024target 2029
Nymphaea Storage
Solar + storage · Nymphaea Solar, LLC
61.0 MWIn study Wichita, TXERCOT Sep 2022target 2028
Celeste Energy Storage
Battery storage
60.9 MWPaused / redesign Pecos, TXERCOT Apr 2020
Fallstone Solar SLF
Solar + storage · Fallstone Solar, LLC
60.6 MWIn study Falls, TXERCOT Dec 2024target 2028
Hondo Arroyo Solar
Solar + storage · Hondo Creek Solar, LLC
60.4 MWIn study Medina, TXERCOT Jun 2024target 2028
Borden Dino BESS
Solar + storage · Borden Dino Solar, LLC
60.3 MWIn study Borden, TXERCOT Apr 2025target 2028
Tipperary Solar
Solar · Tippsol
60.2 MWIn study Schleicher, TXERCOT Jun 2024target 2028
Stonewall Solar
Solar + storage · Stonewall PV, LLC
60.2 MWIn study Stonewall, TXERCOT May 2024target 2029
Lampe Solar
Solar · Gransolar Texas Seven LLC
60.2 MWIn study Washington, TXERCOT Aug 2021target 2027
Indigo Storage 4
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Oct 2023target 2026
Indigo Storage 2
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Sep 2023target 2026
Agate Solar
Solar
60.0 MWPaused / redesign Ellis, TXERCOT Aug 2017
Indigo Storage
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Dec 2022target 2026
HIP ESS Project
Other
60.0 MWPaused / redesign Leon, TXERCOT
Indigo Storage 3
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Nov 2023target 2026
R Massengale
Gas
58.0 MWPaused / redesign Lubbock, TXERCOT Sep 2018target 2021
Chatee Solar
Solar · Hecate Energy
57.0 MWPaused / redesign Pecos, TXERCOT Apr 2015target 2020
Whistle Solar
Solar · Gransolar Texas Nineteen, LLC
56.3 MWIn study Navarro, TXERCOT Nov 2021target 2028
Silver Hills Windpower
Onshore wind · Silver Hills Windpower, LLC
54.1 MWIn study Howard, TXERCOT Apr 2025target 2029
Donna BESS
Solar + storage · Donna Solar LLC
53.9 MWIn study Hidalgo, TXERCOT Mar 2024target 2029
Paloma Energy Center BESS
Solar + storage · Harrison Street Development, LLC
53.6 MWIn study Colorado, TXERCOT Feb 2024target 2027
Wagon Timber Storage
Solar + storage · Wagon Timber Storage, LLC
53.5 MWIn study Knox, TXERCOT Jan 2025target 2028
Fighting Jays Battery
Battery storage
53.2 MWPaused / redesign Fort Bend, TXERCOT Aug 2021
Mars Solar
Solar
52.8 MWPaused / redesign Childress, TXERCOT Feb 2019
Sunbelt Storage
Solar + storage · Rose Hill Solar LLC
52.0 MWIn study Kaufman, TXERCOT Nov 2021target 2026
Steppe Reserve Storage
Battery storage · KCE TX 25, LLC
51.9 MWIn study Dimmit, TXERCOT Jan 2021target 2028
Page 26 of 29

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)