United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Texas — page 25

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,486351.5 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,486 requests · page 25 of 30
ProjectCapacityStatusLocationRegionQueuedOnline
Jayhawk Solar
Solar · Renewable Energy Ventures, LLC
102 MWIn study Mitchell, TXERCOT Aug 2019target 2025
Triangle Ranch Delta
Onshore wind
102 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Rose Quartz BESS
Battery storage · Rose Quartz BESS, LLC
101 MWIn study Dimmit, TXERCOT Sep 2022target 2026
Pisgah Ridge Storage 3
Solar + storage · Pisgah Ridge 3, LLC
101 MWIn study Navarro, TXERCOT Jul 2021target 2026
Blanket Ranch South Solar
Solar + storage · Blanket Ranch South Solar, LLC
101 MWIn study Brown, TXERCOT Jun 2022target 2028
Margay Energy Storage
Battery storage · PowerPulse LLC
101 MWIn study Brazoria, TXERCOT Feb 2025target 2029
Maddox Solar
Solar · Industrial Lima Project LLC
101 MWIn study Grayson, TXERCOT May 2024target 2028
Pinnacle Point Energy Storage
Battery storage · GCI Pinnacle Point, LLC
101 MWIn study Harris, TXERCOT Nov 2023target 2027
Blue Creek Energy Storage
Battery storage · Blue Creek Energy Storage, LLC
101 MWIn study Wharton, TXERCOT Oct 2023target 2028
Kinney County Energy
Battery storage · Kinney County Energy, LLC
101 MWIn study Kinney, TXERCOT Mar 2023target 2027
Lyford Energy
Battery storage · Lyford Energy, LLC
101 MWIn study Willacy, TXERCOT Mar 2023target 2027
Southside Energy
Battery storage · Southside Energy, LLC
101 MWIn study Brazoria, TXERCOT Feb 2023target 2028
Hadrian Energy Storage
Battery storage · Hadrian Energy Storage, LLC
101 MWIn study Wharton, TXERCOT May 2023target 2028
Hynes Bay Energy Storage
Battery storage · Hynes Bay Energy Storage, LLC
101 MWIn study Wharton, TXERCOT Oct 2023target 2027
Strawberry Dunes Solar SLF
Solar + storage · Strawberry Dunes LLC
101 MWIn study Atascosa, TXERCOT Feb 2025target 2028
Saltillo Storage
Battery storage
101 MWPaused / redesign Bastrop, TXERCOT May 2022target 2025
Las Moras Battery
Battery storage · Las Moras Storage, LLC
101 MWIn study Kinney, TXERCOT Jun 2021target 2029
Solar Star Frontier BESS
Battery storage · Solar Star Frontier BESS, LLC
101 MWIn study Cameron, TXERCOT Jun 2023target 2029
Luthor Solar
Solar · TREX US Luthor LLC
101 MWIn study Howard, TXERCOT Jun 2022target 2027
Vaca Storage
Battery storage · Long Mount Storage, LLC
101 MWIn study Calhoun, TXERCOT Mar 2021target 2029
Glory Bee Storage
Solar + storage · Riley Solar LLC
101 MWIn study Erath, TXERCOT Jun 2022target 2026
Sandford Storage
Solar + storage · BT Sandford Solar, LLC
101 MWIn study Wise, TXERCOT Jan 2024target 2028
Long Point Solar II
Solar
101 MWPaused / redesign Brazoria, TXERCOT Jan 2023target 2025
Pinewood BESS
Battery storage
101 MWPaused / redesign Brazoria, TXERCOT Sep 2022
Hide Town Energy Storage
Battery storage · Hide Town Energy Storage LLC
101 MWIn study Scurry, TXERCOT Jan 2023target 2028
Inertia BESS 2
Battery storage
101 MWPaused / redesign Haskell, TXERCOT Oct 2020
Venus Mill Storage
Battery storage
101 MWPaused / redesign Ellis, TXERCOT Mar 2022target 2026
Padrino BESS
Battery storage
101 MWPaused / redesign Hill, TXERCOT Sep 2022
Hana Springs BESS
Battery storage · Black Mountain Energy Storage II LLC
101 MWIn study Lampasas, TXERCOT Nov 2022target 2028
Hondo Arroyo Storage
Solar + storage · Hondo Creek Solar, LLC
101 MWIn study Medina, TXERCOT Dec 2024target 2028
Calf Creek Storage
Battery storage · Coyote Ridge Storage, LLC
101 MWIn study Howard, TXERCOT Nov 2025target 2028
Dolce BESS
Battery storage · Dolce BESS, LLC
101 MWIn study Mitchell, TXERCOT Sep 2022target 2028
Holstein 2 Solar
Solar + storage · 229HD 8me LLC
101 MWIn study Nolan, TXERCOT Dec 2016target 2028
Goat Mountain BESS 2
Wind + storage · Goat Wind LLC
101 MWIn study Sterling, TXERCOT Jan 2025target 2027
Brahman Renewables Solar
Solar + storage · Brahman Renewables
101 MWIn study Milam, TXERCOT Oct 2024target 2029
Ringtail Ridge Storage
Battery storage · KCE TX 26, LLC
101 MWIn study Kendall, TXERCOT Jan 2021target 2028
Echols Creek Storage
Other · BT Ferguson Solar, LLC
101 MWPaused / redesign Lamar, TXERCOT Apr 2023target 2027
Lemma Solar
Solar · Greening USA Corp.
101 MWIn study Knox, TXERCOT Apr 2023target 2028
San Bernard Storage
Other · San Bernard Storage, LLC
101 MWPaused / redesign Wharton, TXERCOT Nov 2019target 2022
Mobee Springs BESS
Battery storage · Mobee Springs, LLC
101 MWIn study Refugio, TXERCOT Jun 2025target 2028
Musgravite Solar
Solar · BT Thompson Solar, LLC
101 MWIn study Henderson, TXERCOT Mar 2024target 2027
Sugarloaf BESS
Battery storage · Sugarloaf Clean Energy LLC
101 MWIn study Dimmit, TXERCOT Mar 2024target 2028
Sagewood BESS
Battery storage · Sagewood BESS, LLC
101 MWIn study Glasscock, TXERCOT Sep 2022target 2028
Felix Storage
Solar + storage · Felix 1, LLC
101 MWIn study Wilbarger, TXERCOT Jan 2023target 2027
Timber Cove Solar SLF
Solar + storage · Freestone Solar, LLC
101 MWIn study Freestone, TXERCOT May 2023target 2027
Triangle Ranch Echo
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Triangle Ranch Fox
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Mud Cat Solar SLF
Solar + storage · Mud Cat Solar, LLC
101 MWIn study Lamar, TXERCOT Oct 2023target 2027
Timberline Storage
Solar + storage · Timberline Renewables, LLC
101 MWIn study Nacogdoches, TXERCOT Aug 2023target 2029
BRP Musca BESS
Battery storage · BRP Musca BESS LLC
101 MWIn study Reagan, TXERCOT Jul 2020target 2027
Page 25 of 30

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)