BATTERY STORAGE Β· ERCOT

Pinewood BESS

Pinewood BESS is a 101 MW battery storage request suspended in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusPaused / redesign
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0171
Grid region
ERCOT (Texas)
Location
Brazoria County, Texas
Technology
Battery: 101 MW
Total requested
101 MW
Queue status
Suspended
Entered queue
1 September 2022

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem