United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2019 requests) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Rockefeller Solar Solar |
208 MW | Paused / redesign |
| Shaula III Solar Solar + storage · Shaula Energy Project III, LLC |
205 MW | In study |
| Axton Solar Solar |
201 MW | Paused / redesign |
| Texas Solar Nova 3 Solar · Texas Solar Nova 1, LLC |
200 MW | In study |
| Solar project J1444, Linn County Solar |
200 MW | In study |
| Garnet Energy Center Solar · Garnet Energy Center, LLC |
200 MW | In study |
| Onshore wind project 360, Wheatland County Onshore wind |
200 MW | Paused / redesign |
| Union City Storage I Battery storage |
200 MW | In study |
| Onshore wind project J1270, Palo Alto County Onshore wind |
200 MW | In study |
| South Dixon Solar Solar · Deriva Energy Solar, LLC |
200 MW | In study |
| Solar + storage project 99, Franklin County Solar + storage |
200 MW | In study |
| Hemlock Ridge Solar Solar · Hemlock Ridge Solar LLC |
200 MW | In study |
| Solar project G0625, Morrow County Solar |
191 MW | In study |
| Gipper Wind Farm Onshore wind · Gipper Wind Farm, LLC |
191 MW | In study |
| Martin County Solar Project Solar |
190 MW | Paused / redesign |
| Battery storage project GEN-2019-065, Smith County Battery storage |
180 MW | In study |
| Scarlet Solar Solar · Innovative Solar 416, LLC |
180 MW | In study |
| Onshore wind project J1365, Tama County Onshore wind |
169 MW | In study |
| Carol Battery Battery storage |
168 MW | Paused / redesign |
| Erie East Energy Battery storage |
160 MW | Paused / redesign |
| Solar + storage project 2019-G42, San Bernardino County Solar + storage |
160 MW | In study |
| Maleza Storage Solar + storage · Brush Storage, LLC |
151 MW | In study |
| Bowfin Solar Solar + storage |
150 MW | Paused / redesign |
| Bright Stalk Generating Facility Onshore wind · Lexington Chenoa Wind Farm LLC |
150 MW | In study |
| Solar project J1221, Wadena County Solar |
150 MW | In study |
| Bear Bin Solar Solar |
150 MW | In study |
| Limestone Solar Solar + storage |
150 MW | In study |
| Plano Skies Energy Center Solar · Plano Skies Energy Center, LLC |
150 MW | In study |
| Solar project GEN-2019-054, Barton County Solar |
150 MW | Paused / redesign |
| Dawson Solar Solar |
150 MW | In study |
| Enclave Solar Energy Center Solar |
149 MW | Paused / redesign |
| Prattsburgh Wind Farm Onshore wind · Prattsburgh Wind, LLC |
147 MW | In study |
| Kensington Solar Solar |
145 MW | Paused / redesign |
| Greens Bayou Expansion Gas |
140 MW | Paused / redesign |
| Oxbow Hill Solar Solar · Oxbow Hill Solar, LLC |
140 MW | In study |
| Pecan Prairie South Solar · ConnectGen Operating LLC |
131 MW | In study |
| LA130S Project Solar + storage |
130 MW | In study |
| Solar + storage project IA-PNM-2019-08, Mckinley County Solar + storage · RWE Solar Dev |
125 MW | Paused / redesign |
| Sugar Maple Solar Solar · Sugar Maple Solar, LLC |
125 MW | In study |
| NY38 Solar Solar · Greens Corners Solar LLC |
120 MW | In study |
| Shorebird Solar Solar |
117 MW | Paused / redesign |
| Trinidad ESS Addition Battery storage |
110 MW | Paused / redesign |
| Holtsville 138kV Energy Storage Battery storage · Holtsville Energy Storage, LLC |
110 MW | In study |
| Replace 103.1 MW of Heskett Units 1 & 2 with One (1) General Electric synchronous combustion turbine; Heskett 1 & 2 Gas |
103 MW | In study |
| Holstein 2 Energy Storage Solar + storage · 229HD 8me LLC |
102 MW | In study |
| San Bernard Solar II Solar · San Bernard Solar II, LLC |
102 MW | Paused / redesign |
| Jayhawk Solar Solar · Renewable Energy Ventures, LLC |
102 MW | In study |
| San Bernard Storage Other · San Bernard Storage, LLC |
101 MW | Paused / redesign |
| Coleto Creek ESS Addition Battery storage |
100 MW | Paused / redesign |
| Independence Trail Storage Battery storage · KCE TX 16, LLC |
100 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)46 · 17.8 GW
- PJM (Mid-Atlantic, Midwest)60 · 7,820 MW
- ERCOT (Texas)38 · 5,908 MW
- NYISO (New York)31 · 2,705 MW
- CAISO (California)3 · 2,352 MW
- Southeast (non-ISO utilities)12 · 1,469 MW
- MISO (Midcontinent)7 · 1,168 MW
- SPP (Southwest Power Pool)5 · 558 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)