BATTERY STORAGE · PJMErie East Energy
Erie East Energy is a 160 MW battery storage request suspended in the PJM interconnection queue, in Erie County, Pennsylvania, connecting to PENELEC.
- PlanningQueued Mar 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AE2-299
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Erie East 230 kV
- Location
- Erie County, Pennsylvania
- Technology
- Battery: 160 MW
- Total requested
- 160 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 22 March 2019
- Proposed online date
- June 2026
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Erie County
- French Creek Solar and BESSSolar + storage · 150 MW · agreement signed
- Wilson SolarSolar · 80.0 MW · agreement signed
- Union City 34.5 kVSolar · 12.0 MW · agreement signed
- Battery storage project AI1-188, Erie CountyBattery storage · 130 MW · in study
- Solar project AI1-030, Erie CountySolar · 5.0 MW · in study
- Solar project AH2-014, Erie CountySolar · 5.0 MW · in study
- Greenfield CSG 1Solar · 4.0 MW · suspended
- Great Lake GrowersSolar · 2.6 MW · suspended
- Erie SolarSolar · 20.0 MW · built
- Gas project B50, Erie CountyGas · 500 MW · withdrawn
- Gas project M15, Erie CountyGas · 302 MW · withdrawn
- Gas project H22, Erie CountyGas · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem