United States › Grid › Interconnection queues › Pennsylvania
BATTERY STORAGE · PJMBattery storage project AI1-188, Erie County
Battery storage project AI1-188, Erie County is a 130 MW battery storage request in interconnection study in the PJM interconnection queue, in Erie County, Pennsylvania, connecting to PENELEC.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI1-188
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Buffalo 115 kV
- Location
- Erie County, Pennsylvania
- Technology
- Battery: 130 MW
- Total requested
- 130 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 9 September 2022
- Proposed online date
- December 2027
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Erie County
- French Creek Solar and BESSSolar + storage · 150 MW · agreement signed
- Wilson SolarSolar · 80.0 MW · agreement signed
- Union City 34.5 kVSolar · 12.0 MW · agreement signed
- Solar project AI1-030, Erie CountySolar · 5.0 MW · in study
- Solar project AH2-014, Erie CountySolar · 5.0 MW · in study
- Erie East EnergyBattery storage · 160 MW · suspended
- Greenfield CSG 1Solar · 4.0 MW · suspended
- Great Lake GrowersSolar · 2.6 MW · suspended
- Erie SolarSolar · 20.0 MW · built
- Gas project B50, Erie CountyGas · 500 MW · withdrawn
- Gas project M15, Erie CountyGas · 302 MW · withdrawn
- Gas project H22, Erie CountyGas · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem