United States › Grid › Interconnection queues › Georgia
SOLAR + STORAGE · SOUTHEASTLimestone Solar
Limestone Solar is a 150 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Macon County, Georgia, connecting to Georgia Transmission.
Queue statusIn planning
- PlanningQueued May 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingSep 2021 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GI-118
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- North Americus – Perry 115 kV TL
- Location
- Macon County, Georgia
- Technology
- Solar: 150 MW · Battery
- Total requested
- 150 MW
- Study phase
- Facilities Study
- Queue status
- Active
- Entered queue
- 30 May 2019
- Proposed online date
- December 2021
- Came online
- September 2021
Location
Marker shows the centre of Macon County; the queue data does not give exact sites.
Other requests in Macon County
- Brenneman SolarSolar · 150 MW · in study
- CPV Stagecoach SolarSolar · 80.0 MW · built
- Weyerhaeuser TG#2Other · 42.0 MW · built
- Flint River (aka Weyerhaeuser)Other · 15.0 MW · built
- Solar project IC-946, Macon CountySolar · 165 MW · withdrawn
- Solar + storage project IC-739, Macon CountySolar + storage · 150 MW · withdrawn
- Solar project IC-798, Macon CountySolar · 150 MW · withdrawn
- Solar project IC-600, Macon CountySolar · 135 MW · withdrawn
- Solar project IC-481, Macon CountySolar · 98.1 MW · withdrawn
- Solar project IC-563, Macon CountySolar · 71.4 MW · withdrawn
- Solar project IC-713, Macon CountySolar · 52.0 MW · withdrawn
- Solar project IC-1010, Macon CountySolar · 38.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem