United States βΊ Grid βΊ Interconnection queues βΊ Georgia
SOLAR Β· SOUTHEASTSolar project IC-1010, Macon County
Solar project IC-1010, Macon County is a 38.0 MW solar request withdrawn in the Southeast interconnection queue, in Macon County, Georgia, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2022 (completed)
- Withdrawn / abandonedNov 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-1010
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- North Americus - Perry 115 kV Line
- Location
- Macon County, Georgia
- Technology
- Solar: 38.0 MW
- Total requested
- 38.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 13 January 2022
- Withdrawn
- November 2022
Location
Marker shows the centre of Macon County; the queue data does not give exact sites.
Other requests in Macon County
- Limestone SolarSolar + storage Β· 150 MW Β· in study
- Brenneman SolarSolar Β· 150 MW Β· in study
- CPV Stagecoach SolarSolar Β· 80.0 MW Β· built
- Weyerhaeuser TG#2Other Β· 42.0 MW Β· built
- Flint River (aka Weyerhaeuser)Other Β· 15.0 MW Β· built
- Solar project IC-946, Macon CountySolar Β· 165 MW Β· withdrawn
- Solar + storage project IC-739, Macon CountySolar + storage Β· 150 MW Β· withdrawn
- Solar project IC-798, Macon CountySolar Β· 150 MW Β· withdrawn
- Solar project IC-600, Macon CountySolar Β· 135 MW Β· withdrawn
- Solar project IC-481, Macon CountySolar Β· 98.1 MW Β· withdrawn
- Solar project IC-563, Macon CountySolar Β· 71.4 MW Β· withdrawn
- Solar project IC-713, Macon CountySolar Β· 52.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem