United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas (2023 requests) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Bulldog Power (TEF - Due Diligence) Gas · Bulldog Power LLC |
311 MW | In study |
| Oak Tree Energy Storage Battery storage · Live Oak Energy Storage, LLC |
310 MW | In study |
| Buffalo Prairie Storage Solar + storage · Buffalo Meadow Energy Center, LLC |
308 MW | In study |
| Haute Stockage Battery storage |
307 MW | Paused / redesign |
| Beaujolais BESS Battery storage |
307 MW | Paused / redesign |
| Cuchillas BESS Solar + storage · Gransolar Texas Two |
307 MW | In study |
| Laurel Wind Energy Center Onshore wind · LAUREL ENERGY CENTER, LLC |
307 MW | Agreement signed |
| Wolf Hollow III Gas · Wolf Hollow II Power LLC |
306 MW | In study |
| Panhandle Flagship Solar 2 Solar + storage · Panhandle Solar Group Operating Company LLC |
304 MW | Agreement signed |
| WOE Gyp King Wind Onshore wind · KSK Wind Farm 1, LLC |
304 MW | Paused / redesign |
| NavBoot BESS Battery storage · Navboot BESS LLC |
304 MW | Agreement signed |
| Whitewright Solar 2 Solar · SunWR, LLC |
302 MW | In study |
| Amerada Solar Solar + storage · Amerada Solar, LLC |
302 MW | In study |
| Riverbend Solar SLF Solar + storage · Riverbend Renewables, LLC |
302 MW | In study |
| Rubicon Power BESS Battery storage · Rubicon Power LLC |
301 MW | In study |
| Acker BESS Battery storage · Ogallala BESS LLC |
301 MW | Agreement signed |
| Battery storage project GEN-2022-139, Harrison County Battery storage |
300 MW | In study |
| Tres Rios Ranch BESS Solar + storage · LectricWind LLC |
290 MW | In study |
| Inadale BESS Solar + storage · Inadale BESS, LLC |
287 MW | In study |
| Inadale Solar Solar + storage · Inadale Solar, LLC |
281 MW | In study |
| Santa Garcias Solar Solar · Oxy Renewable Energy LLC |
265 MW | In study |
| Dundee East B Wind Onshore wind · Felix 2, LLC |
261 MW | Agreement signed |
| Panhandle Flagship Solar 3 Solar + storage · Panhandle Solar Group Operating Company LLC |
260 MW | Agreement signed |
| Ochoa Energy Storage Battery storage · Ochoa Energy Storage LLC |
260 MW | In study |
| Goodnight Wind II Onshore wind · FGE Goodnight II, LLC |
259 MW | Agreement signed |
| First Capitol BESS Battery storage · First Capitol BESS, LLC |
258 MW | Agreement signed |
| Van Zandt Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
257 MW | In study |
| Shamrock II Wind Onshore wind |
257 MW | Paused / redesign |
| Nautilus Heavy Storage Battery storage · Nautilus Heavy Storage, LLC |
256 MW | In study |
| Leaning Tree BESS Battery storage |
256 MW | Paused / redesign |
| Lonesome Dove BESS Battery storage |
256 MW | Paused / redesign |
| Railway BESS Battery storage |
255 MW | Paused / redesign |
| Staked Plains BESS Battery storage |
255 MW | Paused / redesign |
| Lazy U Solar 2 Solar · Lazy U Solar 2 |
252 MW | In study |
| Little Ridge Storage Battery storage · TX BESS B LLC |
252 MW | In study |
| Lazy U Solar 1 Solar · Lazy U Solar 1 |
252 MW | In study |
| Juniper Ridge BESS 2 Battery storage · Lazy U ESS 2 |
252 MW | In study |
| Juniper Ridge BESS 1 Battery storage · Lazy U ESS 1 |
252 MW | In study |
| Buffalo Meadow Solar Solar + storage · Buffalo Meadow Energy Center, LLC |
251 MW | In study |
| Mesa View Storage Battery storage · Mesa View Storage, LLC |
251 MW | In study |
| Clutch City Solar Phase II Solar · HZ SOLAR I, LLC |
251 MW | Agreement signed |
| Fort Concho Energy storage Battery storage · Rocky Mountain Energy Development, LLC |
251 MW | In study |
| Bluegill BESS Battery storage · Bluegill BESS, LLC |
251 MW | In study |
| Sf250SB Solar + storage |
250 MW | Agreement signed |
| Misty Hollow BESS Battery storage · Clear Fork BESS, LLC |
246 MW | Agreement signed |
| Hill Valley BESS Battery storage · Hill Valley BESS, LLC |
246 MW | In study |
| Diaz BESS Battery storage · BRP Blue Topaz 10, LLC |
242 MW | In study |
| Duffy BESS Solar + storage · Duffy Energy Storage LLC |
241 MW | Agreement signed |
| Jane Storage Energy Center Battery storage · NMRE Holdings, LLC |
241 MW | In study |
| GridGuardian BESS Battery storage · SMT Temple BESS LLC |
228 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)