Oak Tree Energy Storage

Oak Tree Energy Storage is a 310 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Lavaca County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0091
Grid region
ERCOT (Texas)
Developer
Live Oak Energy Storage, LLC
Connection point (POI)
Tap Shaula (#5380) – South Texas (#5915)
Location
Lavaca County, Texas
Technology
Battery: 310 MW
Total requested
310 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
4 December 2023
Proposed online date
August 2029

Location

Marker shows the centre of Lavaca County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem