United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) — page 19
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Kenyon Substation - NG Western RI DG Area Study Solar |
3.5 MW | Withdrawn / abandoned |
| Hopkins Hill - NG WRI DG Area Study #2 <5 MW Solar |
3.5 MW | Withdrawn / abandoned |
| Falmouth 933 - EMA ASO Solar + storage |
3.5 MW | Withdrawn / abandoned |
| Bath 115 kV SS - Midcoast Area DG Study Solar |
3.4 MW | Withdrawn / abandoned |
| Hydro Hydro |
3.3 MW | Withdrawn / abandoned |
| Solar + battery Solar + storage |
3.2 MW | Withdrawn / abandoned |
| Tower Hill - NG WRI DG Area Study #2 <5 MW Solar |
3.1 MW | Withdrawn / abandoned |
| Tower Hill Substation - Western RI DER Study #3 Solar |
3.1 MW | Withdrawn / abandoned |
| Solar Solar |
3.1 MW | Withdrawn / abandoned |
| Paxton BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Point St Substation – Aldrich St BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Sheld BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
3.0 MW | Withdrawn / abandoned |
| Fisher Road 657 - EMA ASO Solar + storage |
3.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
3.0 MW | Withdrawn / abandoned |
| Putnam Pike - NG WRI DG Area Study #2 <5 MW Solar |
3.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
3.0 MW | Withdrawn / abandoned |
| TMLP Landfill Solar Solar |
3.0 MW | Withdrawn / abandoned |
| New London Substation - NG Western RI DG Area Study Solar |
3.0 MW | Withdrawn / abandoned |
| Coopers Mills 115 kV SS - Midcoast Area DG Study Solar |
2.9 MW | Withdrawn / abandoned |
| Wind uprate Onshore wind |
2.9 MW | Withdrawn / abandoned |
| Solar Solar |
2.8 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
2.8 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
2.8 MW | Withdrawn / abandoned |
| Solar Solar |
2.7 MW | Withdrawn / abandoned |
| Wind Onshore wind |
2.7 MW | Withdrawn / abandoned |
| Puddledock Road 115 kV SS - Augusta Area Study Solar |
2.5 MW | Withdrawn / abandoned |
| Oswald - WMA ASO Solar + storage |
2.5 MW | Withdrawn / abandoned |
| Solar Solar |
2.5 MW | Withdrawn / abandoned |
| Royalston - NG Western MA Area Cluster Study Solar |
2.5 MW | Withdrawn / abandoned |
| Douglas Woods Wind Unit 12 Onshore wind |
2.5 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
2.5 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.5 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.4 MW | Withdrawn / abandoned |
| Chase Hill Substation - Western RI DER Study #3 Solar |
2.4 MW | Withdrawn / abandoned |
| Wolf Hill substation - NG Western RI DG Area Study Solar |
2.2 MW | Withdrawn / abandoned |
| Project Increase Other |
2.2 MW | Withdrawn / abandoned |
| Solar Solar |
2.2 MW | Withdrawn / abandoned |
| Individual @ French King Solar + storage |
2.2 MW | Withdrawn / abandoned |
| Generator Increase Other |
2.1 MW | Withdrawn / abandoned |
| CMP Vallee Lane 115 kV SS - Louden-Biddeford Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Athens 115 kV SS - CMP Wyman Area Study Solar |
2.0 MW | Withdrawn / abandoned |
| Solar + Battery Solar + storage |
2.0 MW | Withdrawn / abandoned |
| Pratts Junction substation - NG Western MA Area Cluster Study Solar |
2.0 MW | Withdrawn / abandoned |
| Ludden Lane 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Topsham 115 kV SS - Midcoast Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Individual @ Amherst Battery storage |
2.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.0 MW | Withdrawn / abandoned |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar |
2.0 MW | Withdrawn / abandoned |
| Highland/Park St 115 kV SS - Midcoast Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)