United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
SOLAR Β· ISO-NESolar
Solar is a 2.5 MW solar request withdrawn in the ISO-NE interconnection queue, in Franklin County, Massachusetts, connecting to NU.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 991
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- Eversource Cumberland station
- Location
- Franklin County, Massachusetts
- Technology
- Solar: 2.5 MW
- Total requested
- 2.5 MW
- Queue status
- Withdrawn
- Entered queue
- 9 April 2020
- Proposed online date
- November 2023
- Withdrawn
- June 2025
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Franklin County
- Battery additionOther Β· 6.7 MW Β· agreement signed
- Northfield Mt. Equipment ReplacementBattery storage Β· 1,180 MW Β· built
- Northfield Mt Upgrade #1Battery storage Β· 25.0 MW Β· built
- Wendell Depot Substation - NG Western MA Area Cluster StudySolar Β· 15.0 MW Β· built
- Battery StorageBattery storage Β· 366 MW Β· withdrawn
- Battery StorageBattery storage Β· 160 MW Β· withdrawn
- Battery StorageBattery storage Β· 105 MW Β· withdrawn
- Battery StorageBattery storage Β· 105 MW Β· withdrawn
- Battery StorageBattery storage Β· 101 MW Β· withdrawn
- Battery Storage + SolarSolar + storage Β· 101 MW Β· withdrawn
- Battery StorageBattery storage Β· 100 MW Β· withdrawn
- Battery StorageBattery storage Β· 55.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem