United States › Grid › Interconnection queues › Massachusetts

ONSHORE WIND · ISO-NE

Douglas Woods Wind Unit 12

Douglas Woods Wind Unit 12 is a 2.5 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2010 (completed)
  2. Withdrawn / abandonedSep 2013 (project stopped here)
  3. ConsentedMay 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
328
Grid region
ISO-NE (New England)
Connection point (POI)
GRID 69 kV S19 at E. Webster Substation
Location
Worcester County, Massachusetts
Technology
Wind: 2.5 MW
Total requested
2.5 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
6 May 2010
Agreement signed
24 May 2013
Proposed online date
October 2014
Withdrawn
September 2013

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem