🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

Individual @ French King

Individual @ French King is a 2.2 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Franklin County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2023 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1404
Grid region
ISO-NE (New England)
Connection point (POI)
EE French King 21B
Location
Franklin County, Massachusetts
Technology
Solar: 2.2 MW · Battery
Total requested
2.2 MW
Queue status
Withdrawn
Entered queue
13 June 2023
Withdrawn
June 2025

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem